Installing workshop safety barriers (partition nets) requires careful planning and execution to ensure durability and effectiveness. Follow these steps:
- Site Preparation: Clear the installation area, marking precise positions for posts using chalk or markers. Ensure the layout complies with safety regulations and workflow needs.
- Post Installation:
- Dig holes (depth ≥50 cm) for vertical posts, spacing them 2–3 meters apart based on net width.
- Secure posts with concrete or anchor bolts. Use a level to ensure vertical alignment. Allow concrete to cure for 24 hours.
- Net Attachment:
- Unroll the barrier net and attach it to posts using galvanized clamps, bolts, or wire ties. Maintain consistent tension to prevent sagging.
- For heavy-duty applications, reinforce edges with tension wires.
- Quality Check:
- Inspect connections for stability. Test the net’s resistance by applying moderate pressure.
- Trim excess material and smooth sharp edges to avoid injuries.
Tools needed: Level, drill, shovel, wrench, measuring tape.
Safety tip: Wear gloves and goggles during installation.
Proper installation enhances workspace safety, equipment protection, and operational efficiency.
Post time: Mar-26-2025